Services

Sectors

Offshore wind

Floating units, walk-to-work vessels and installation assurance for the developer. A floating wind unit is towed out, moored and connected like any other floating asset. We bring the same assurance to offshore wind that we bring to floating production, alongside the vessel work the sector runs on. Kjetil A. Walland was site manager on Hywind Scotland, the world’s first floating wind farm.

What we deliver

Installation assurance for the developer

Independent review of loadout, seafastening, lift, cable and tow procedures on the developer’s side, and management of the marine warranty surveyor’s comments through to close-out.

Floating wind tow and hook-up

Tow, mooring hook-up and connection assurance for floating wind units. The marine phase is the same one we run on FPSO, FSO and FSRU campaigns, and the experience carries across directly.

Walk-to-work gangway FMEA and trials

Failure modes and effects analysis, proving trials, operations manuals and crew onboarding for W2W gangway systems on service operation vessels.

Vessel suitability and DP assurance

DP FMEA review, trials witnessing, and suitability and condition surveys for SOVs, CSOVs and installation vessels before they are fixed.

When to involve us

Before the vessel is fixed and before the installation procedures are frozen. For floating wind, at the point the tow and hook-up sequence is being written — that is where the marine risk sits.

Typical engagement: a defined scope per campaign or per vessel, or a retained arrangement across a fleet or a build programme.

Led by

Kjetil A. Walland

Partner, Marine & Technical Delivery · Oslo

Contact

If you have a unit in build, on tow or about to connect, we would like to hear about it.

A partner will reply, usually within one working day.